Construction Scheduler

Added
2 minutes ago
Type
Full time
Salary
Upgrade to Premium to se...

Related skills

power bi smartsheet autodesk construction cloud cpm procore

📋 Description

  • Develop, maintain, and communicate construction schedules that the field, subcontractors, and
  • Build baseline CPM schedules from drawings, specs, estimates, bid packages, and construction
  • Maintain the live schedule: collect progress from superintendents, project managers, and trades
  • Own the critical path. Identify near-critical work, float erosion, and out-of-sequence progress.
  • Produce three-week (or similar) look-aheads that match the master schedule and what the field can
  • Analyze schedule impact of RFIs, change orders, design late-outs, access constraints, long-lead

🎯 Requirements

  • 4+ years of construction scheduling on active projects (GC, CM, owner’s project controls, or
  • 4+ years of experience using Oracle Primavera P6 and comfortability with multiple calendars
  • 4+ years of experience with owner/CM specification-driven schedules (e.g., DCMA 14-point, USACE, or
  • Bachelor’s in construction management, civil engineering, or a related field — or equivalent field
  • PSP (AACE), PMI-SP, PMP, CCM, or similar credential.
  • Experience with owner/CM specification-driven schedules (e.g., DCMA 14-point, USACE, or similar

🎁 Benefits

  • Willing to work extended hours as needed, including the current 6-day / 12-hour construction
  • Must be comfortable working in a fully onsite environment.

🛃 Visa sponsorship

Share job

Meet JobCopilot: Your Personal AI Job Hunter

Automatically Apply to Engineering Jobs. Just set your preferences and Job Copilot will do the rest — finding, filtering, and applying while you focus on what matters.

Related Engineering Jobs

See more Engineering jobs →